Is $1200 fair for a full front end job on a customer van at a home shop?

Nov 24, 2026 Last reply: 15 hours ago 6 Replies

First reply

Karen_Sawdust

$1200 for labor on that list is right about where I'd land, call it $100 an hour, and that's a fair number for a home shop. Going forward though, I'd stop billing by the clock and start billing book time. Look up the book hours for each job on the list, add them up, and bill…

Read the full reply

So I took in a customer van as a side hustle from my garage at home to do the whole front end. Charged $1200 for the job and it ended up taking me about 10-11 hours, and honestly that was at a 'I barely wanna do this' pace. I keep going back and forth on wheather I charged too little or if that's about right for this kind of work.



The list was pretty long. Lower and upper control arms, ball joints, sway bar links, a shock, the Pitman arm, and both outer and inner tie rods. On top of that the steering gear box might need replacing too, wich woud add more time and parts. The van has 360,xxx miles on it so everything up front is pretty worn.



What would you all think is a good price for this? I know a real shop would charge way more but I'm just curious where I landed. Should I have gone higher given how much was involved, or is $1200 allready pushing it for a side gig out of a home garage?


$1200 for labor on that list is right about where I'd land, call it $100 an hour, and that's a fair number for a home shop. Going forward though, I'd stop billing by the clock and start billing book time. Look up the book hours for each job on the list, add them up, and bill that total whether you finished in less time or more. Some jobs you come out ahead, some you eat a little, but it evens out and the customer sees a number they can compare against a real shop. At your pace it also means you're not punished for doing it slow and careful, which on a van with that many miles is the right way to do it anyway. The parts question matters just as much. If that $1200 was labor only and you billed parts on top, you did fine. If parts were baked into the $1200, you probably left money on the table. My habit is parts at cost plus about 30 percent, which covers the running around, the one part that shows up wrong and has to go back, and the fact that your own money is tied up until the customer pays. On the gear box, if it ends up needing replacement, quote it as its own line item with its own book hours. Don't roll it into the front end price, or you'll be doing a big job for free. Two practical things since you're doing this under your own roof. Get the van on jack stands before you're under it, not just the floor jack. A jack is for lifting, stands are for holding, and that's not optional with this much work ahead of you. And grab some parts trays, even a few cheap ones, and keep the hardware sorted per corner. Working with everything loose on the floor is just extra work, and nothing burns time like hunting for that one bolt you set down somewhere.

That 'barely wanna do it' pace is real, I felt the same way doing the front end on my own van, every rusty bolt seemed designed to test my patience. Doing it for a paying customer is another level though, because you can't cut corners or leave a job half done overnight the way you can on your own rig. For that reason alone I think you landed okay at $1200. Did you settle how you're handling the gear box yet? I'd want that quoted separate before getting deeper into a van with that many miles.

The way you put it, that van with the miles it's got, every one of those front end pieces probably fought you a little, so I'd say you landed fine at $1200. I'll back up the parts markup point with my own story: I once fronted a whole parts order for a neighbour's truck out of my own pocket at straight cost, and the few weeks I waited to get paid stung enough that I never did it again. That 30 percent isn't greed, it's your money sitting on a shelf. One thing I'm curious about though, did you ever settle how you're quoting that gear box if it needs doing?

Beginner here, so forgive the dumb wording, but that steering box thing you said might need doing, is that the round part behind the front wheels the wheels connect to through the rods? I only ask because if it goes bad after you've already done everything else, that sounds like tearing half of it apart again. Maybe worth deciding before you button it all up? Also curious how you even got the old arms loose on a van with that many miles, I'd assume everything is rusted into one lump by now.

The gear box getting quoted as its own line item is the point I'd underline hardest here. I let a maybe-job get rolled into a main quote once and watched it turn into free labor, so that one stuck with me. On the beginner's question, I'd say deciding before you close everything up makes sense, since redoing half the front end on a van with that mileage would be miserable. So what's the box doing that makes you think it's on the way out, leaking or just loose feeling?

Update: glad the price seems fair, the book time idea makes sense and I'll add a markup on parts next time instead of just passing cost along. To the beginner asking about the steering box, yes, it's that round gear the Pitman arm bolts to, and if it goes after the rest is done you're basically back in there. How do you all look up book hours without paying for a shop subscription?

Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required