house update

We are going thru the mechanical phase of the construction. The AC guy is finished for now. The electrician will be thru the rough next week. The plumber has had the rough inspection and then disappeared to another job. He is also doing the heat which 2 days away from testing the zones. No boiler yet. The electric, cable and tele are underground if the wiring inspector ever gets his ass out here to inspect. The new electric service is 400 AMP. The electrician said that they have used over 8000 feet of wire so far. Ken and I were allowed to pull the low voltage CAT 5e and CATV. We have used approximately 1,100 ft of CATV and close to 3,500 ft of CAT 5e. Each room has 2 Data ports, 1 CATV and 1 tele. I bought a swing out wall mount network cabling rack. There is a 48 port patch panel of which 38 will eventually be assigned. I have a 24 port 10/100 unmanaged switch. I would like to pickup a Cisco 24 port managed switch in addition. The wiring is definitely overkill for now but it will be ready for whatever may come along. I also have 2 wireless access points. The network cabling can also be used for audio. Ken is working on building a device for the audio distribution. The drywall contractor estimates 320 sheets of 4X12 Blueboard. Using 1 primer and 2 finish coats I will need approximately 130 gallons of paint.

I have seen an MD who also does Homeopathy. She has prescribed a remedy which was ordered from a Rx in CA. It is being shipped Priority mail and I expect the delivery tomorrow. I am also taking a Probiotic called Primal Defense. She said that these remedies would initially irritate the Diverticulitis and I have been feeling a higher level of discomfort since I started the Probiotic. I am taking my fiber faithfully and I believe that it helps.

Brian

Reply to
Brian Hurley
Loading thread data ...

MotorsForum website is not affiliated with any of the manufacturers or service providers discussed here. All logos and trade names are the property of their respective owners.