patch job

Jul 27, 2005 2 Replies

Hello all, Off topic. Sorry.



I'm doing a patch job to the underside of a fibreglass driftboat with fibreglass matt and roving material (weave).



What is applied first after the area is wetted down woth expoxy resin - the matt or the weave?



The material is about 18" x 18"



Thank you. Eddy


The weave then the matt the weave provides strength and the mat provides the finish.

Join the Discussion

Have something to add? Share your thoughts — no account required.

Didn't find your answer?

Ask the community — no account required