I'm finally getting round to thinking seriously about having a go at replacing both the footwell and door pillar on my IIa 109, is there a recommended sequence for doing this (footwell then pillar, pillar then footwell or cut them both out at the same time)?
As to the replacement bits, are there any preferred suppliers to make the job as pain free as possible? Looks like I'll need the pillar, footwell and top corner of the bulkhead. How is the bracket at the bottom of the pillar attached to it (looks like it might be OK).
What's the best way (which measurements) to make sure the pillar is in the right place before welding?